Kingston will not tell you informally whether your house qualifies: the only way to find out is to apply and pay the £170 inspection fee, which you lose if you are refused. Its rules are the same as Sutton's, and they are precise enough to check yourself first.
This page covers homes in Kingston, Surbiton, New Malden, Tolworth and Chessington. Kingston and Sutton share one vehicle crossover policy. Construction is by the council's term contractors, at prices fixed each year.
The rules at a glance
Parking space
At least 4.8m long and 2.7m wide, at right angles to the road, measured from the front of any bay window. No short frontage agreements.
Crossover width
2.7m to 4m at the back of the pavement.
Street trees
No highway tree is removed. Nothing within the root protection area, 12 times the trunk diameter measured 1.5m up, and never within 1m of the trunk.
Distances
Not within 10m of a junction or traffic signal (15m on A, B or C roads), or 10m of a crossing, refuge, bus stop or bus cage. Keep 1m from lamp columns and signs.
Parking bays
A crossover must not need a change to the traffic order, such as removing a CPZ permit bay. If one is allowed, you pay the full cost.
Slope and visibility
The ramp must be no steeper than 1 in 12. Front walls and shrubs no higher than 1m, with a clear view 3.3m along the boundary each way.
What a dropped kerb costs in Kingston upon Thames
- Inspection fee: £170, non-refundable if your application is refused.
- Building the crossover: costs are non-negotiable, adjusted each year and set under the council's term contract.
- Extra if needed: moving a street light, traffic sign or post, removing and replanting trees, adjusting utility covers, and changing a CPZ traffic order.
Do you need planning permission?
Usually not for a house. You are likely to need it if:
- you are in a conservation area
- your road is a classified A, B or C road
- the property is a flat, maisonette, house in multiple occupation or commercial premises
- your hardstanding is not porous and does not drain within your garden
You do not usually need planning permission for a dropped kerb. If you live on a private road you need planning permission instead of the council's highways approval. Planning permission alone does not let you build a crossover: you still need a separate crossover application.
How long it takes
Under the shared policy, quotes and permissions last three months, and construction takes up to five days once started.
If you are refused
Decisions are final, with appeals only in exceptional circumstances at a senior manager's discretion. If you think the rules were misapplied, write to the council with your reasons.
Before you pay the application fee
- Measure 4.8m deep by 2.7m wide, from the front of any bay window.
- Measure round the nearest street tree, divide by 3.14 and multiply by 12 to see its root protection area.
- Check you are 10m from a junction (15m on a classified road), crossing or bus stop.
- Check the slope from road to driveway is no steeper than 1 in 12.
- Look at the kerb outside: a parking bay or yellow line that would need removing is a likely refusal.
How Kingston upon Thames compares with its neighbours
| Council | Application fee | Minimum parking space | Street tree rule |
|---|---|---|---|
| Sutton | £175.10 | 4.8m × 2.7m (same policy) | Root protection area 12× trunk diameter |
| Richmond upon Thames | £295 | 4.8m × 4.8m forecourt | Refused within 4× the tree's circumference |
| Merton | £206 | 4.8m × 2.3m | Not within 1m; removal refused |