Checked against council websites and fee schedules on 19 November 2026. Most councils change their fees on 1 April.

If your house is in a controlled parking zone, a new dropped kerb usually takes a resident parking bay off the street. Removing that bay needs a legal change to the traffic order, and councils pass the cost to you on top of the application fee and the building work. Across the 12 London councils that publish an amount, that one charge runs from £195 to £4,000.

£195Lowest: Enfield
£4,000Highest: Haringey
20×Gap between the two
12 of 33London councils publish an amount

The ranking

Extra charge for a dropped kerb in a CPZ, on top of the application fee and the cost of building the crossover.

Hounslow says the applicant pays for the traffic order change but publishes no amount, so it is not in the chart.

Borough by borough

The CPZ charge with the council's application fee alongside it. Both are usually paid before any building work, and the application fee is non-refundable at almost every council below.

BoroughCPZ chargeApplication feeBoth togetherWhat the CPZ charge coversIf it fails
Haringey£4,000£361*£4,361£600 bay consultation plus £3,400 traffic order. The order must be made permanent within two years or re-advertised.Consultation fee kept
Camden£3,980.28None upfront£3,980.28Traffic order consultation.Kept, no guarantee
Greenwich£3,737£125£3,862Consultation, making the order, and changing signs and lines.Not stated
Waltham Forest£3,500+£475£3,975+Minimum charge for the consultation and traffic order change. Another section of the same guidance gives £3,660. A £400 legal agreement is also required.Kept, no guarantee
Merton£3,000£206£3,206Traffic order change for one applicant. Falls to £300 each if nine more applicants are waiting.Kept, no guarantee
Wandsworth£1,900£279£2,179Traffic order change, taking up to three months. Work cannot start until it clears.Not stated
Ealing£1,500+£75£1,575+Yellow-line change "may exceed £1,500" and take three months or more. CPZ bay changes are priced after a site visit.Not stated
Bexley£1,374£57£1,431Parking controls change and traffic order amendment (up from £1,210 the year before).Not stated
Harrow£1,230£140£1,370Parking bay consultation.Charged whatever the outcome
Barnet£868.78£234.61£1,103.39Final traffic order amendment. Rises to £1,393.78 if objections are received but not upheld.Not stated
Lewisham£337£148£485Contribution to signs, road markings and the traffic order. "May be payable" (figures from the extension form).Not stated
Enfield£195£264£459Changing the CPZ traffic management order. Moving or re-marking bays is priced on application.Not stated
HounslowNot publishedNot published–Applicant pays for the traffic order change. Only 2.4m crossovers are built in CPZs.No guarantee

* Haringey's application fee is from a 2023 cross-borough comparison; the council's current guidance points to its website without stating it. The building work itself is extra everywhere.

Why this charge exists

The layout of a controlled parking zone, every bay and every yellow line, is set out in a legal document called a traffic management order. If a dropped kerb would cut through a bay, the council has to change that order before it can remove the bay. That means drafting the change, advertising it, and considering any objections from neighbours. Councils treat this as a cost you have created, so they recharge it.

Some councils go further and refuse to remove bays at all where parking is tight. Wandsworth refuses a new access in a CPZ if it and its yellow lines would take more than 4.5m of kerb, or if existing accesses already take half the kerbside. Newham says new dropped kerbs are unlikely unless there are exceptional circumstances. In Hammersmith & Fulham every public road is in a CPZ.

Before you pay anything

  1. Look at what is painted outside your house. A resident bay, pay-and-display bay or yellow line across your frontage means the CPZ charge almost certainly applies.
  2. Treat the application fee as spent. It is non-refundable at almost every council above, including when your application is refused.
  3. Check whether the CPZ charge is also lost on refusal. In Camden, Harrow and Merton it is charged whatever happens, with no promise the bay can be removed.
  4. In Merton, apply with your neighbours. The traffic order charge drops from £3,000 to £300 per household when ten applications go together.
  5. Check the width you can get. In Hounslow only 2.4m crossovers are built in CPZs, which may not suit a wide driveway.
  6. Allow for time as well as money. Wandsworth and Ealing both say the order change can take three months or more, and work cannot start until it is done.
Not in the table? The other 21 London councils did not publish a separate CPZ amount in the pages we checked. Most still charge for bay changes, often "on application" or "after a site visit". Ask your council for the figure in writing before paying the application fee.

How we checked

Every figure comes from the council's own website, fee schedule, application form or published guidance, checked on 19 November 2026. Where a council's own pages disagree, we use the newer one and say so. Councils usually change their fees on 1 April, so we re-check every borough each spring. This site is independent and not connected to any council. Always confirm the current figure with your council before applying.